An alterations and additions architect in Sydney does one thing a new-build designer does not: works with a house that already exists. The existing structure, the planning controls on the lot and the way the family lives all constrain the answer.
An alterations and additions architect in Sydney does one thing a new-build designer does not: works with a house that already exists. The existing structure, the planning controls on the lot and the way the family lives all constrain the answer. A renovation that gets approved and builds on budget comes from handling those in the right order. This is that order.
Before any design, the existing building has to be understood. That means a measured survey of the house and a detail survey of the site, so the drawings reflect what is there instead of what an old plan says.
It also means looking at how the house was built. Sydney's housing stock has patterns. Federation and interwar houses in the Inner West and lower North Shore often have solid brick walls, high ceilings and a run of small rooms at the back. Post-war homes may be brick veneer or fibro on timber frames. Each takes change differently.
The most useful early question is which parts are worth keeping. Front rooms with good proportions usually are. Later lean-to additions at the rear usually are not.

Three numbers and a handful of overlays decide how much you can add:
A Section 10.7 planning certificate from council lists the overlays. Your council's development control plan sets the detailed rules. Both should be read before a line is drawn, and both are available through council or the NSW Planning Portal.
Large parts of the Inner West, Eastern Suburbs, lower North Shore and Ku-ring-gai sit in heritage conservation areas. In those areas the fast-track complying development pathway is generally unavailable for external work, and a development application is required.
Council will expect the street presentation to be kept. Additions go to the rear, sit below the main ridge, and use materials that respect the original without imitating it. A heritage impact statement usually accompanies the application.
This is not a reason to avoid renovating. Most of the alterations and additions we have designed are in established suburbs of this kind. It does mean the design has to be argued, and that is where experience shows.

There are three ways to get a better house from the one you have:
Many projects combine two. The right mix depends on the lot, the controls and the budget.
Our honest advice: test the reconfigure option first. Plenty of families who come in asking for an extension need a better plan, not a bigger house. Extra floor area that does not fix a poor layout is money spent on the wrong problem.
Good alterations and additions resolve the join between old and new. Floor levels, ceiling heights and roof lines rarely line up without thought. The junction is either made seamless or made deliberate, and both are legitimate.
Buildability matters as much as appearance. The design should account for:
These are questions of sequencing and structure, and they belong in the design stage. Our additions and alterations work is documented with construction staging in mind for that reason.
Where the site allows it and the design meets every standard, a complying development certificate is the quicker route. Otherwise a development application goes to council. Alterations costing $50,000 or more also need a BASIX certificate covering energy and water performance.
Settle the pathway early, because it shapes the drawings. Our DA and CDC documentation page explains the difference.
Renovating costs more per square metre than building new. Work is done around an existing structure, access is harder, and old houses hide things: undersized footings, asbestos sheeting, wiring that has to be replaced once it is disturbed.
We do not quote build prices, and you should be wary of any figure given before a design exists. What we recommend:
NSW guidance on asbestos in homes is published by SafeWork NSW.
Send us the address, a few photos and your list of what is not working. We will come back with what the controls allow and which of the three approaches suits the house.
An alterations and additions architect designs changes to an existing house, prepares the approval documents and produces construction drawings for builders to price. The work includes measuring the existing building, testing planning controls, resolving how new work joins old, and coordinating the engineer and other consultants.
It depends on the site and the design. Work that meets every State complying development standard can be approved with a complying development certificate. Properties in heritage conservation areas, or designs that vary a control, generally need a development application to council.
It depends on how much of the house is being kept. Modest additions to a sound house usually cost less than rebuilding. When most of the structure is being altered, a rebuild can cost a similar amount. Heritage controls may rule out demolition regardless.
Sometimes. Rear additions can often be built while the family lives in the front of the house. Second storey additions and full internal renovations usually require moving out for part of the build. The design and staging decide what is practical.
A complying development certificate is commonly issued within weeks of a complete application. A development application commonly takes several months. Survey, design and documentation come first and add to the overall timeframe.
Planning a second storey addition in Sydney? How the design and approval process works, what drives the cost, and what to check before you start.
Read more → Granny flat designGranny flat design in NSW explained. The size and lot rules, who designs, who approves and who builds, and what affects secondary dwelling design cost.
Read more → Dual occupancyDual occupancy design in Sydney starts with the block. What your lot needs, how approval works, what affects the cost and what a designer handles.
Read more →